After a vacation at Sailors Haven, and some more tuna trips, work began again today.
Today's focus was on getting the boat ready for flipping. This included securing and gluing the bow plate and the anchor locker shelf. This shelf was put in before the bow gunnel plate to make it easier to cut and glass it in place.
The next steps to take before flipping her over will be to trim the excess gunnel plate around the bow, and build up the transom with two more sheets of 3/4" ply
damn maybe it will float after all
ReplyDelete-hanly